The mechanical merge preserved both histories but left two repositories
sitting side by side rather than one repository. This is the part that
makes it whole.
A top-level README explains the three strands - the telescope network
and campaign, the processing code, and in-person observing plans - and
says plainly that image data does not live here, because that is the
first question anyone will have when they find a pipeline with no
pixels.
state/PROJECT.md was still describing a markdown-only reference project
whose scope explicitly EXCLUDED automating bookings and image
processing. Both of those are now most of what the project does, so the
objective, scope and key facts are rewritten to match reality.
state/DECISIONS.md records why the merge happened - the two repos were
split by chronology rather than design, and the seam was already
leaking, with the campaign's TODO citing results held in the other repo
and the pipeline's README explaining a campaign it did not contain. It
also records that the image data deliberately stays out of the
repository.
state/TODO.md gains the pipeline and observing work that previously had
nowhere to live, including the measurement that changes the pipeline
plan: per-frame processing is 2.9 seconds and the whole 24-frame session
is 1.1 minutes single-threaded, so a scheduler earns nothing on stacking
and should be pointed at the Monte Carlo stages instead.
Internal links fixed for the new paths: pipeline/README.md referred to
session-scripts/ throughout, and itelescope/README.md pointed at a
state/ directory that is now one level up.
The .gitignore conflict between the two repositories is resolved by
combining them, with image formats ignored globally except under docs/,
where documentation figures are committed deliberately.
User decision 2026-07-18: use the full 2,638-point balance on southern
imaging, then cancel the membership before the 12 Aug renewal (GBP 32).
CAMPAIGN.md holds the plan: policy facts that force the order (points are
non-refundable and unusable without an active subscription, per support
article 142963), a three-phase allocation shaped by the moon (dark-night
LRGB now and 3-10 Aug, narrowband through the bright 24 Jul - 2 Aug week),
a per-session ledger to reconcile against account/history.aspx, the 10 Aug
data-download-then-cancel endgame, and the rule that the cancellation POST
itself is never submitted without explicit user confirmation on the day.
plans/ngc6744-t59.txt is the first paid run (T59, L 15x300 Bin1 + RGB
7x300 Bin2, ~180 min imaging, ~240 pts), already uploaded to T59 and
verified byte-identical. PROJECT.md and TODO.md updated to make the drain
the active objective for any future session.
Repo created for a reference/review of the iTelescope.net remote telescope
network. This commit copies the Default Workflow in (CLAUDE.md and docs/ from
the Default-Workflow repo), adds a .gitignore (secrets and scratch), and fills
in state/PROJECT.md with the objective: review every telescope on the network
and provide a choosing guide, using only public sources (support article and
the maintained Google Sheet; the go.itelescope.net launchpad is login-only).