Drain campaign: spend the balance by 10 Aug, then close the account
User decision 2026-07-18: use the full 2,638-point balance on southern imaging, then cancel the membership before the 12 Aug renewal (GBP 32). CAMPAIGN.md holds the plan: policy facts that force the order (points are non-refundable and unusable without an active subscription, per support article 142963), a three-phase allocation shaped by the moon (dark-night LRGB now and 3-10 Aug, narrowband through the bright 24 Jul - 2 Aug week), a per-session ledger to reconcile against account/history.aspx, the 10 Aug data-download-then-cancel endgame, and the rule that the cancellation POST itself is never submitted without explicit user confirmation on the day. plans/ngc6744-t59.txt is the first paid run (T59, L 15x300 Bin1 + RGB 7x300 Bin2, ~180 min imaging, ~240 pts), already uploaded to T59 and verified byte-identical. PROJECT.md and TODO.md updated to make the drain the active objective for any future session.
This commit is contained in:
parent
3e9f4e5cff
commit
08fef91b57
4 changed files with 88 additions and 0 deletions
|
|
@ -24,6 +24,11 @@
|
|||
plans/ngc6752.txt (uploaded to T33, verified) if the 47 Tuc test succeeded,
|
||||
otherwise retries ngc104-test.txt. Whichever session runs must record its
|
||||
outcome here and in NOTES so the other knows.
|
||||
- DRAIN CAMPAIGN ACTIVE (see CAMPAIGN.md): spend the full balance by 10 Aug,
|
||||
then cancel before the 12 Aug renewal (user confirmation required for the
|
||||
cancel itself). First paid run: NGC 6744 on T59 (plans/ngc6744-t59.txt,
|
||||
uploaded and verified), scheduled 2026-07-19 after the free test, ~240 pts.
|
||||
Update the CAMPAIGN.md ledger after every session from account/history.aspx.
|
||||
|
||||
## Pending
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue