Merge pull request 'Drain campaign: spend the balance by 10 Aug, then close' (#7) from drain-campaign into main

This commit is contained in:
laurence 2026-07-18 22:41:35 +01:00
commit 09e2d95358
4 changed files with 88 additions and 0 deletions

65
CAMPAIGN.md Normal file
View file

@ -0,0 +1,65 @@
# Drain campaign: spend 2,638 points, then close the account
Decision (2026-07-18): use the full points balance on southern imaging, then cancel
the membership. Constraints and policy facts that shape the plan:
- Balance 2,638 points; Plan-40 renews 12 Aug 2026 (GBP 32). Cancel BEFORE renewal.
- Points cannot be refunded, and cannot be used without an active subscription
(support article 142963). So: drain first, cancel last, in that order.
- **Cancellation target: 10 Aug 2026**, two days before renewal. Cancellation is
submitted via MyAccount/Cancel.aspx and requires explicit user confirmation on the
day; Claude must not submit it unprompted.
- Rates: see the rate card in state/NOTES.md. Billing is per minute of imaging time.
- Moon: bright nights roughly 24 Jul - 2 Aug (full ~29 Jul); dark again 5-12 Aug.
Full-moon week includes free access promotions; paid draining focuses on dark and
grey nights, narrowband carries the bright week.
- Scope availability is volatile (much of Chile offline as of 18 Jul); re-check the
status line on go.itelescope.net before every session and substitute freely.
## Session ledger
Update after every run: date, scope, target, imaging minutes, points charged
(from account/history.aspx), cumulative spend.
| Date | Scope | Target | Plan file | Imaging | Est. pts | Actual pts | Notes |
|---|---|---|---|---|---|---|---|
| 2026-07-19 | T33 | 47 Tuc | ngc104-test.txt | 17 min | 0 (free) | | first-light test |
| 2026-07-19 | T59 | NGC 6744 | ngc6744-t59.txt | 180 min | ~240 | | first paid run |
| 2026-07-20 | T33 | NGC 6752 | ngc6752.txt | 17 min | 0 (free) | | |
## Planned allocation (~2,600 points, adapt as scopes/weather allow)
**Phase 1, dark nights now - 23 Jul (~1,030 pts):**
- T59 NGC 6744 LRGB, 3 h, ~240 (scheduled 19 Jul)
- T32 Centaurus A LRGB, 2 h, ~292: early UK-afternoon window while it is high
- T8 Corona Australis dust complex LRGB, 2 h, ~260
- T70 (Chile) Scorpius tail / Prawn super-wide LRGB, 2 h, ~238
**Phase 2, bright nights 24 Jul - 2 Aug (~440 pts, narrowband only):**
- T59 NGC 6188 in Ha/OIII/SII 5nm, 3 h total, ~240
- T8 Ha on the Cat's Paw / War and Peace field, 1.5 h, ~195
- Plus any full-moon free promotions for clusters (cost 0, not part of the drain)
**Phase 3, dark nights 3 - 10 Aug (~1,130 pts):**
- T8 SMC + 47 Tucanae in one frame, 3 h LRGB, ~390: the signature shot, SMC well
placed in the second half of the SSO night by August
- T8 or T59 Large Magellanic Cloud attempt if it clears the elevation limits late
in the window; otherwise Tarantula on T32, 2 h, ~292
- Remainder (~450): best-of list: repeat the strongest target for more depth, or
Chile scopes (T71 106/hr, T73 224/hr) if they return from maintenance: Tarantula
and NGC 1313 preferred. Aim to land the balance under ~50 points.
**10 Aug: verify balance is near zero, download ALL data from data.itelescope.net,
then (with explicit user confirmation) cancel via MyAccount/Cancel.aspx.**
## Operational notes
- Every paid session follows plans/README.md (walk-in when idle; same ACP flow as
the free scopes). Upload plans the day before where possible.
- Cron jobs live only in an open Claude session; if a day's session has no live
session to fire it, the user prompts "run today's drain session" and any session
picks it up from this file plus state/TODO.md.
- Bad-data protection: iTelescope refunds points for weather-ruined runs on
request; check each session's images before marking the ledger final.
- Final data sweep before cancellation: everything on data.itelescope.net AND the
per-scope /images/qisback/ folders.

13
plans/ngc6744-t59.txt Normal file
View file

@ -0,0 +1,13 @@
;
; NGC 6744 paid session on T59 for qisback
; L 15x300s Bin1, RGB 7x300s each Bin2.
; 180 min imaging = ~240 pts at Plan-40 rate 80/hr before moon discount.
;
#largepreviews
#tiff
#count 15,7,7,7
#interval 300,300,300,300
#binning 1,2,2,2
#filter Luminance,Red,Green,Blue
NGC6744 19.162833 -63.857500
#shutdown

View file

@ -8,6 +8,11 @@
A reference and review of the iTelescope.net remote telescope network: what each
telescope is, what it is good at, and which one to book for a given kind of target.
Since 2026-07-18 the active objective is the drain campaign (CAMPAIGN.md): spend
the account's 2,638 points on southern-sky imaging by 10 Aug 2026, download all
data, then cancel the membership before the 12 Aug renewal. Cancellation needs
explicit user confirmation on the day.
## Scope
- In scope: reviews and spec tables for every telescope on the iTelescope network,

View file

@ -24,6 +24,11 @@
plans/ngc6752.txt (uploaded to T33, verified) if the 47 Tuc test succeeded,
otherwise retries ngc104-test.txt. Whichever session runs must record its
outcome here and in NOTES so the other knows.
- DRAIN CAMPAIGN ACTIVE (see CAMPAIGN.md): spend the full balance by 10 Aug,
then cancel before the 12 Aug renewal (user confirmation required for the
cancel itself). First paid run: NGC 6744 on T59 (plans/ngc6744-t59.txt,
uploaded and verified), scheduled 2026-07-19 after the free test, ~240 pts.
Update the CAMPAIGN.md ledger after every session from account/history.aspx.
## Pending