Merge pull request 'T33 first-light prep: 47 Tuc test plan and runbook' (#4) from t33-first-light into main
This commit is contained in:
commit
422b36552c
3 changed files with 82 additions and 1 deletions
65
plans/README.md
Normal file
65
plans/README.md
Normal file
|
|
@ -0,0 +1,65 @@
|
|||
# Observing plans and the T33 session runbook
|
||||
|
||||
ACP observing plans for iTelescope scopes, plus the procedure to run one on T33
|
||||
(the free Siding Spring scope). Credentials are NOT in this repo: they live in
|
||||
the local claudetemp itelescope folder (creds.txt, `username=`/`password=` lines).
|
||||
|
||||
## Plan format (ACP)
|
||||
|
||||
See [ngc104-test.txt](ngc104-test.txt). Directives, then a target line:
|
||||
`Name<TAB>RA_decimal_hours<TAB>Dec_decimal_degrees`. Counts, intervals, binning
|
||||
and filters are parallel comma-separated lists. `#shutdown` parks safely at the
|
||||
end (iTelescope's own one-click plans do the same).
|
||||
|
||||
## T33 endpoints (base http://t33.itelescope.net:8033, HTTP auth = iTelescope creds)
|
||||
|
||||
| Purpose | Path |
|
||||
|---|---|
|
||||
| Status JSON (times, obsStat, obsOwner) | /ac/SystemStatus/asystemstatus.asp |
|
||||
| Console text | /ac/SystemStatus/aconsread.asp |
|
||||
| Scope connect control | /ac/SystemStatus/ascopeconn.asp |
|
||||
| Shutter/roof status | /ac/SystemStatus/ashutterctl.asp |
|
||||
| My plan folder (list/upload/delete) | /plans/qisback/aindex.asp, aupload.asp, adelfile.asp |
|
||||
| Run a plan ("Acquire Images") | POST /ac/Plans/plan.asp |
|
||||
| My logs | /logs/qisback/aindex.asp |
|
||||
| Finished data | data.itelescope.net |
|
||||
|
||||
Upload: multipart POST to `/plans/qisback/aupload.asp`, fields `File1` (the file)
|
||||
and `DestPath=/plans/qisback`. Verified working 2026-07-18; content round-trips
|
||||
exactly.
|
||||
|
||||
Run: the web UI posts the plan select to `/ac/Plans/plan.asp`; the select's value
|
||||
is the WINDOWS path `C:\ProgramData\ACP\ACP Web Data\Doc Root\plans\qisback\<file>`.
|
||||
Field names seen: `plan`, optional `VPhot`, `AutoLogoff`. NOT yet exercised live
|
||||
(observatory was closed, daytime); the first live session must confirm whether a
|
||||
scope-connect POST (ascopeconn.asp) is required first, and capture the exact
|
||||
response shape.
|
||||
|
||||
## The 47 Tuc free-session test (ngc104-test.txt)
|
||||
|
||||
- Target: NGC 104 / 47 Tucanae, RA 0.4015 h, Dec -72.0814 deg (circumpolar at SSO).
|
||||
- L 4x120 s, RGB 2x90 s each, Bin2: about 17 min exposure, about 24 min with
|
||||
overhead, inside the daily free 30 minutes.
|
||||
- Uploaded to /plans/qisback/ on 2026-07-18 and verified.
|
||||
|
||||
### When to run
|
||||
|
||||
47 Tuc clears T33's 20 degree minimum elevation in the second half of the SSO
|
||||
night. SSO local = UTC+10; the good window is roughly 14:00-19:30 UTC (UK
|
||||
afternoon/evening). Sunrise at SSO was 06:14 local (20:14 UTC) at recon time;
|
||||
stop well before dawn.
|
||||
|
||||
### Procedure
|
||||
|
||||
1. GET asystemstatus.asp: confirm observatory open (obsStat) and no other user
|
||||
(obsOwner n/a). If someone is on, wait and retry; T33 is first-come.
|
||||
2. Confirm the plan file is still in /plans/qisback/ (aindex.asp).
|
||||
3. POST plan.asp with the plan's Windows path to start acquisition.
|
||||
4. Poll aconsread.asp (console) every minute or two: slew, centering, filter
|
||||
changes, exposures. The run self-terminates via #shutdown.
|
||||
5. Images land in /images/qisback/ on the scope server and then on
|
||||
data.itelescope.net; logs in /logs/qisback/.
|
||||
6. Record the session outcome in state/NOTES.md.
|
||||
|
||||
Abort path if something looks wrong: the web UI exposes an abort on the console
|
||||
page; locate it live before starting exposures (not yet mapped).
|
||||
12
plans/ngc104-test.txt
Normal file
12
plans/ngc104-test.txt
Normal file
|
|
@ -0,0 +1,12 @@
|
|||
;
|
||||
; 47 Tucanae (NGC 104) free-session test plan for qisback
|
||||
; L 4x120s, RGB 2x90s each, Bin2. ~17 min exposure, ~24 min with overhead.
|
||||
;
|
||||
#largepreviews
|
||||
#tiff
|
||||
#count 4,2,2,2
|
||||
#interval 120,90,90,90
|
||||
#binning 2,2,2,2
|
||||
#filter Luminance,Red,Green,Blue
|
||||
NGC104 0.401500 -72.081389
|
||||
#shutdown
|
||||
|
|
@ -15,7 +15,11 @@
|
|||
|
||||
## In progress
|
||||
|
||||
- (nothing)
|
||||
- T33 first-light test: ngc104-test.txt (47 Tuc, ~24 min LRGB) uploaded to
|
||||
/plans/qisback/ on T33 and verified. Run window: 2026-07-19 roughly 14:00-19:30
|
||||
UTC when 47 Tuc clears the 20 degree limit. Procedure in plans/README.md.
|
||||
Remaining: live-run the plan (confirm the plan.asp POST and any scope-connect
|
||||
step), monitor via console, pull images/logs, record outcome in NOTES.
|
||||
|
||||
## Pending
|
||||
|
||||
|
|
|
|||
Loading…
Add table
Add a link
Reference in a new issue