T33 first-light prep: 47 Tuc test plan and session runbook

plans/ngc104-test.txt is the ACP observing plan for the free 30-minute proof
run on T33: NGC 104 / 47 Tucanae, L 4x120s + RGB 2x90s at Bin2 (~17 min
exposure, ~24 min with overhead), modelled on the account's previous
one-click plan format (decimal-hours RA, decimal-degrees dec, #shutdown at
end). Already uploaded to the scope's /plans/qisback/ folder and verified to
round-trip byte-identical.

plans/README.md is the runbook: the T33 ACP endpoint map (status JSON,
console read, scope connect, plan upload/run, logs), the verified upload
procedure, the not-yet-exercised acquire POST with its Windows-path plan
value, the 47 Tuc run window (second half of the SSO night, ~14:00-19:30
UTC), and the step-by-step session procedure including the open questions a
first live run must answer (scope-connect requirement, abort control).

state/TODO.md tracks the test as in progress.
This commit is contained in:
Laurence 2026-07-18 22:09:24 +01:00
parent c6aeaa6af8
commit 61aae7dca2
3 changed files with 82 additions and 1 deletions

View file

@ -15,7 +15,11 @@
## In progress
- (nothing)
- T33 first-light test: ngc104-test.txt (47 Tuc, ~24 min LRGB) uploaded to
/plans/qisback/ on T33 and verified. Run window: 2026-07-19 roughly 14:00-19:30
UTC when 47 Tuc clears the 20 degree limit. Procedure in plans/README.md.
Remaining: live-run the plan (confirm the plan.asp POST and any scope-connect
step), monitor via console, pull images/logs, record outcome in NOTES.
## Pending