f49e045bb6 Book free T33 47 Tuc retry (749314); defer cra-t8 on quota + hajo conflict
- Session ran early (08:48 UTC, before Cen A 749302's 08:50 UTC start), so this
  round did only the time-sensitive, unblocked work.
- Free T33 47 Tuc retry booked and grid-verified as reservation 749314
  (night of 21 Jul SSO, 00:05-00:50, runs 14:05 UTC). Third attempt: the two
  prior free reservations expired unused, so if this one also fails to run the
  issue is free-scope auto-start, not the booking.
- Cen A (749302) verify deferred: had not run yet; runs 08:50-11:50 UTC.
- cra-t8 (queue #2) deferred, blocked twice: quota held by Cen A until ~11:50
  UTC, AND user hajo holds T8 00:25-02:25 SSO local that night (res 749207),
  overlapping the planned 01:35-04:35 slot. Documented resolution options;
  preferred is slipping cra-t8 one night to 2026-07-23T01:35 to dodge the
  conflict and keep Corona Australis near culmination.
- Scheduled job ae3af497 (~12:13 UTC) will verify Cen A and book cra-t8 against
  a live grid re-check.
2026-07-21 09:52:35 +01:00
bd31a8a6fb Rebook Cen A on T32 as evening reservation 749302; document quota-driven booking order
- Reservation 749302 created and grid-verified: T32, night of 21 Jul SSO,
  18:50-21:50 local (08:50-11:50 UTC 21 Jul), plan cena-t32.txt, est ~350 pts
  at the corrected x1.6 rate with 25% moon discount (46% moon ~30 deg away).
- The original queue slot (00:35-03:35) was an astronomy error: T32 has a
  35 degree elevation floor and Cen A culminates ~17:10 SSO local in late July,
  sinking to ~11 degrees by midnight. Evening is the only viable window; noted
  in the ledger so the mistake is not repeated.
- Reschedule flag confirmed to never stick (second booking posting
  RescheduleCheckbox=on that renders as No in the grid): every reservation is
  one-shot, verify the morning after.
- Quota math recorded: 5h20m of 8h held; queue #2 (cra-t8) plus the free T33
  47 Tuc retry must wait for the Cen A run to release its 3h (~11:50 UTC
  21 Jul). Full remaining queue at corrected rates ~2,530 vs 2,257 balance:
  Phase 3 needs a ~270-point trim once real bills confirm the rate model.
2026-07-20 21:56:56 +01:00
07713c2f13 Record 19-20 Jul session outcomes: T59 success (381 pts), T33 free runs missed
- T59 NGC 6744 (reservation 749227) ran 00:05-03:30 SSO local 20 Jul and billed
  381 points (txn 851148), not the ~240 estimated. Full LRGB dataset verified on
  the scope server (L 15x300s BIN1, R/G/B 7x300s each BIN2); preview JPEGs
  checked: round stars, clean galaxy, no weather damage, so no refund claim.
- Rate correction in state/NOTES.md: history 'Time Used' equals wall-clock
  session time (3h24m32s), and the effective rate was ~112 pts/hr wall /
  ~127 pts/hr exposure vs the 80/hr the UpdatePlan rate card predicted. All
  existing queue estimates flagged ~1.6x low until more bills confirm the model.
- Both free T33 reservations (749228 47 Tuc, 749229 NGC 6752) expired unused:
  no images, no logs; grid shows reschedule=No despite the flag being set at
  booking. First-light test is still outstanding; plans remain uploaded on T33.
- Ledger, booked-reservations table and queue updated: balance verified 2,257
  via GetAccountStatus; queue #1 (Cen A T32) missed its 21 Jul slot and needs a
  new night.
2026-07-20 21:30:11 +01:00
a091e38bc4 Booking queue: full campaign reservations attempted, quota documented
All seven remaining campaign sessions were attempted against
reservations.itelescope.net in one pass. The rolling reservation allowance
(8 hours outstanding on Plan-40) admitted only the Cat's Paw Ha session
(749230, T8, night of 26 Jul, verified via Edit.aspx?id= since the grid
cannot page that far forward); the other six returned 'quota.' and are
recorded as a ready-to-fire queue with exact New.aspx parameters. All plans
are uploaded and verified on T8/T32/T59; T70's plan could not be uploaded
(scope server unreachable, consistent with the Chile outage) and its entry
is blocked pending the server returning.

Substitution rules recorded: T71, if it returns, takes the widefield
sessions (better optics, lower rate); T70 books as-is if reachable; status
line checked before every booking round. Booking cadence: a daily job (or
manual 'process the booking queue') books queue items in order as completed
sessions release quota.
2026-07-18 23:25:22 +01:00
9003d672ff Reservations created for all three sessions; mechanics documented
The Reservations Pilot app at reservations.itelescope.net is now mapped and
driven end to end: three-step WebForms flow (form GET, Refresh Plans
postback with plan+times selected which enables Confirm, then Confirm),
observatory-local times, 4-hour maximum, plan attachment causing iTelescope
to auto-start the run at reservation start, and the reschedule flag that
rebooks weather losses on the next free night. Crucial gotcha recorded: the
confirm modal returns OK even when nothing was created (first attempt
silently failed on the 4-hour rule), so verification against the grid is
mandatory.

Live reservations: 749227 (T59, NGC 6744, 00:05-03:45 SSO local 20 Jul),
749228 (T33, 47 Tuc test, 00:05-00:50 same night), 749229 (T33, NGC 6752,
00:05-00:50 following night). Ledger corrected: T59 moon discount is 0%
until 21 Jul (the earlier 25% figure came from a Utah scope's grid), so the
NGC 6744 estimate returns to ~240 pts. Monitoring crons replace the old
starter crons since the scheduler now fires the plans itself.
2026-07-18 23:04:26 +01:00
c1d353ca10 T59 window fix: third-party reservation constrains the NGC 6744 run
The booking grid (Reservation/Overview.aspx embeds the DayPilot events)
shows astrosharp holding T59 from 03:50 to 04:40 SSO local on 20 Jul, i.e.
17:50-19:40 UTC on 19 Jul, which collided with the original 15:33 UTC
walk-in start. The run is rescheduled to start ~14:15 UTC (parallel with
the free T33 test, different scope) so it completes by 17:45 UTC, with a
trim-or-skip rule if the start slips. The grid also confirms a 25% moon
discount in effect, so the cost estimate drops from ~240 to ~185 points;
ledger updated. Times in the embedded grid are per-observatory local time
(verified against Utah sunset and the first-quarter moon note).
2026-07-18 22:56:36 +01:00
08fef91b57 Drain campaign: spend the balance by 10 Aug, then close the account
User decision 2026-07-18: use the full 2,638-point balance on southern
imaging, then cancel the membership before the 12 Aug renewal (GBP 32).
CAMPAIGN.md holds the plan: policy facts that force the order (points are
non-refundable and unusable without an active subscription, per support
article 142963), a three-phase allocation shaped by the moon (dark-night
LRGB now and 3-10 Aug, narrowband through the bright 24 Jul - 2 Aug week),
a per-session ledger to reconcile against account/history.aspx, the 10 Aug
data-download-then-cancel endgame, and the rule that the cancellation POST
itself is never submitted without explicit user confirmation on the day.

plans/ngc6744-t59.txt is the first paid run (T59, L 15x300 Bin1 + RGB
7x300 Bin2, ~180 min imaging, ~240 pts), already uploaded to T59 and
verified byte-identical. PROJECT.md and TODO.md updated to make the drain
the active objective for any future session.
2026-07-18 22:41:33 +01:00