# TODO > The current state of play. Keep it honest and current; this is what the next session > reads to know what to do. Move items between sections as they progress. ## Done - 2026-07-17: repo created on git.discworld.casa, Default Workflow scaffold copied in. - 2026-07-17: specs sheet snapshotted to data/itelescope-telescopes.csv (24 scopes). - 2026-07-17: TELESCOPES.md written: per-scope reviews for all 23 active telescopes plus a choosing guide (T74 noted as in commissioning, no specs published). - 2026-07-18: TARGETS.md written: southern targets invisible from the UK (dec tiers from lat 51.5°N), matched to Q62/X07 scopes, seasonal booking calendar, and a July-August starter campaign (T33 free, T71 narrowband, T73 galaxy, T8 LMC later). ## Done (recent) - 2026-07-20: NGC 6744 on T59 SUCCEEDED (reservation 749227, txn 851148): full LRGB dataset on the scope server (L 15x300s BIN1, RGB 7x300s each BIN2), previews verified clean. Billed 381 pts (est was ~240: see the rate correction in NOTES.md). Balance now 2,257. Ledger updated in CAMPAIGN.md. ## In progress - T33 first-light test STILL OUTSTANDING: reservations 749228 (47 Tuc, night of 19 Jul) and 749229 (NGC 6752, night of 20 Jul) both expired unused: no images, no logs, and the grid showed reschedule=No despite the flag being set at booking. Plans are still uploaded and verified on T33. Next free window: night of 22 Jul SSO (21 Jul ~14:05 UTC). Rebook 00:05-00:50 with ngc104-test.txt, and investigate the reschedule flag (may not stick on free scopes, or the checkbox POST was ignored). - DRAIN CAMPAIGN ACTIVE (see CAMPAIGN.md): spend the full balance by 10 Aug, then cancel before the 12 Aug renewal (user confirmation required for the cancel itself). 381 of 2,638 spent; 2,257 remain. IMPORTANT: estimates run ~1.6x low vs actual billing (see NOTES rate correction): re-cost the queue before booking more. Queue #1 (Cen A T32) missed its 21 Jul slot and needs a new night. Download the NGC 6744 data from data.itelescope.net before the 10 Aug cancellation sweep. Update the CAMPAIGN.md ledger after every session from account/history.aspx. ## Pending - Automation: map the ACP web endpoints on a per-scope server (start with free T33) for plan submission and status; explore lookup.itelescope.online (the new planner); enumerate more /DataService.svc methods. Recon notes in NOTES.md. - Campaign impact (status seen 2026-07-18): T71 and T73 are offline (development/mount testing), as are T2, T17, T18, T20, T25, T30, T72, T74, T75, T80. T8, T33, T32, T59 at Siding Spring are operational. Re-plan the July-August campaign around T33 free time and Siding Spring scopes until the Chile rebuild finishes; re-check status before any booking. - Fill in T74 when iTelescope publishes its specs. - Reconcile the retired scopes (T9, T19, T31, T69): the support article still lists them but the maintained sheet does not; confirm status and note it. - Optional: per-telescope detail pages on support.itelescope.net (links in DECISIONS.md) hold photos and operational history if deeper entries are ever wanted. - Periodic refresh: re-export the Google Sheet and diff against data/ to catch new or changed systems.