# TODO > The current state of play. Keep it honest and current; this is what the next session > reads to know what to do. Move items between sections as they progress. ## Done - 2026-07-17: repo created on git.discworld.casa, Default Workflow scaffold copied in. - 2026-07-17: specs sheet snapshotted to data/itelescope-telescopes.csv (24 scopes). - 2026-07-17: TELESCOPES.md written: per-scope reviews for all 23 active telescopes plus a choosing guide (T74 noted as in commissioning, no specs published). - 2026-07-18: TARGETS.md written: southern targets invisible from the UK (dec tiers from lat 51.5°N), matched to Q62/X07 scopes, seasonal booking calendar, and a July-August starter campaign (T33 free, T71 narrowband, T73 galaxy, T8 LMC later). ## Done (recent) - 2026-07-20: NGC 6744 on T59 SUCCEEDED (reservation 749227, txn 851148): full LRGB dataset on the scope server (L 15x300s BIN1, RGB 7x300s each BIN2), previews verified clean. Billed 381 pts (est was ~240: see the rate correction in NOTES.md). Balance now 2,257. Ledger updated in CAMPAIGN.md. ## Done (recent) - 2026-07-21 ~08:55 UTC: free T33 47 Tuc retry booked as reservation 749314 (grid-verified), third attempt at the first-light test, runs 14:05-14:50 UTC 21 Jul, costs 0. ## In progress - T33 first-light test on its THIRD booking (749314). The two prior free reservations (749228, 749229) expired unused with reschedule=No; the free-scope auto-start appears not to fire. If 749314 also fails to run, stop rebooking and either walk it in (POST plan.asp per plans/README.md) or drop the free objective. - CEN A verify pending: reservation 749302 (T32) runs 08:50-11:50 UTC 21 Jul. After 11:50 UTC, confirm images on t32.itelescope.net:8032, pull the actual bill from Account/History.aspx, spot-check a preview, and refine the x1.6 rate model in NOTES.md. - cra-t8 (queue #2) NOT yet booked, deferred twice over: (1) quota held by Cen A until ~11:50 UTC; (2) user hajo holds T8 00:25-02:25 SSO local that night (res 749207), overlapping our planned 01:35-04:35. Resolution: prefer booking the NEXT night (2026-07-23T01:35-04:35) to dodge hajo and keep altitude; see the resolution note in CAMPAIGN.md. Scheduled job ae3af497 (~12:13 UTC) handles Cen A verify + this booking with a live grid re-check. - DRAIN CAMPAIGN ACTIVE (see CAMPAIGN.md): spend the full balance by 10 Aug, then cancel before the 12 Aug renewal (user confirmation required for the cancel itself). 381 of 2,638 spent; 2,257 remain. Estimates run ~1.6x low vs actual billing (see NOTES rate correction). Reschedule flag never sticks (grid always shows No): treat every reservation as one-shot and verify the morning after. Download the NGC 6744 data from data.itelescope.net before the 10 Aug cancellation sweep. Update the CAMPAIGN.md ledger after every session from account/history.aspx. ## Pending - Automation: map the ACP web endpoints on a per-scope server (start with free T33) for plan submission and status; explore lookup.itelescope.online (the new planner); enumerate more /DataService.svc methods. Recon notes in NOTES.md. - Campaign impact (status seen 2026-07-18): T71 and T73 are offline (development/mount testing), as are T2, T17, T18, T20, T25, T30, T72, T74, T75, T80. T8, T33, T32, T59 at Siding Spring are operational. Re-plan the July-August campaign around T33 free time and Siding Spring scopes until the Chile rebuild finishes; re-check status before any booking. - Fill in T74 when iTelescope publishes its specs. - Reconcile the retired scopes (T9, T19, T31, T69): the support article still lists them but the maintained sheet does not; confirm status and note it. - Optional: per-telescope detail pages on support.itelescope.net (links in DECISIONS.md) hold photos and operational history if deeper entries are ever wanted. - Periodic refresh: re-export the Google Sheet and diff against data/ to catch new or changed systems.