astrophotography/state/DECISIONS.md
laurence 59d6e30712 Make the merged repository coherent: README, state, and internal links
The mechanical merge preserved both histories but left two repositories
sitting side by side rather than one repository. This is the part that
makes it whole.

A top-level README explains the three strands - the telescope network
and campaign, the processing code, and in-person observing plans - and
says plainly that image data does not live here, because that is the
first question anyone will have when they find a pipeline with no
pixels.

state/PROJECT.md was still describing a markdown-only reference project
whose scope explicitly EXCLUDED automating bookings and image
processing. Both of those are now most of what the project does, so the
objective, scope and key facts are rewritten to match reality.

state/DECISIONS.md records why the merge happened - the two repos were
split by chronology rather than design, and the seam was already
leaking, with the campaign's TODO citing results held in the other repo
and the pipeline's README explaining a campaign it did not contain. It
also records that the image data deliberately stays out of the
repository.

state/TODO.md gains the pipeline and observing work that previously had
nowhere to live, including the measurement that changes the pipeline
plan: per-frame processing is 2.9 seconds and the whole 24-frame session
is 1.1 minutes single-threaded, so a scheduler earns nothing on stacking
and should be pointed at the Monte Carlo stages instead.

Internal links fixed for the new paths: pipeline/README.md referred to
session-scripts/ throughout, and itelescope/README.md pointed at a
state/ directory that is now one level up.

The .gitignore conflict between the two repositories is resolved by
combining them, with image formats ignored globally except under docs/,
where documentation figures are committed deliberately.
2026-07-21 17:16:20 +01:00

3.3 KiB

Decisions

A dated, append only log of decisions and their rationale. Newest at the top. Never rewrite past entries; if a decision is reversed, add a new entry that says so.

2026-07-21: merge itelescope and astro-pipeline into one repository

The two were split by accident of chronology rather than by design. itelescope began as a reference to the telescope network and grew into the campaign that books and runs sessions; astro-pipeline was created three hours before this merge to hold the processing code once it was moved out of the image directory. They describe two halves of one activity, and the seam was already leaking: the campaign's TODO referred to processing results held in the other repo, and the processing code's README explained a campaign it did not contain.

Merged with both histories preserved, by relocating each repository's files into a subdirectory in its own history first and then merging the unrelated histories. 44 commits, and git log --follow still traces a file across the move.

Layout: itelescope/ for the network and campaign, pipeline/ for the code, observing/ for in-person plans, with the Default Workflow files (CLAUDE.md, docs/, state/) at the top level governing the whole repository.

The old repositories are not deleted. The drain campaign is live until 10 Aug with sessions running most nights, and other sessions may be working in itelescope at the moment of the merge. Both carry a notice pointing here. Archive them once the campaign closes, not before.

2026-07-21: image data does not live in the repository

A single calibrated frame is 61 MB and a session runs to several gigabytes. Sessions stay on disk, organised into named subdirectories, and the code finds them through the ASTRO_SESSION environment variable. Each session carries its own METHODS.md describing what was done and what was found, so the account of the data travels with the data while the code travels separately.

2026-07-17: follow the Google Sheet, not the support article

The support article (https://support.itelescope.net/support/solutions/articles/247371) and the maintained Google Sheet (https://docs.google.com/spreadsheets/d/1jZWkkjewOuyNC9YzQ8y2d0pO1e4T7EBeysmQMPBVSOk/) disagree: the article lists T9, T19, T31, T69, which the sheet omits; the sheet has T25, T26, T59, T71-T75, T80, which the article lacks. The article itself points to the sheet as the current source, so the review follows the sheet and notes the discrepancy. The sheet CSV export is snapshotted in data/ so the review's numbers remain reproducible even if the sheet changes.

2026-07-17: single review document, not per-telescope files

23 active scopes each need only a spec block and a short assessment; one TELESCOPES.md grouped by observatory reads better and is easier to keep current than 23 stub files. Revisit if per-scope content grows (photos, session logs).

2026-07-17: no launchpad scraping

https://go.itelescope.net/ is an authenticated app shell with no public data. All content comes from public support pages and the public sheet; nothing in this repo requires iTelescope credentials.

Per-telescope detail pages, if ever needed: support.itelescope.net/support/solutions/articles/231901-231920 (older scopes), 245471 (T68), 251171 (T70), 251556 (T69), 251589 (T19).